Walkpath to CSU East
Contractor: Baldwin Paving
Completed: Summer 2010
Project provided a 5' sidewalk along Snelling Drive that connects parking lots E and D and unites East Side of the Campus with CSU East Facility.
Area Before
Area After
Contractor: Baldwin Paving
Completed: Summer 2010
Project provided a 5' sidewalk along Snelling Drive that connects parking lots E and D and unites East Side of the Campus with CSU East Facility.