Upgrade HVAC System-Faculty Hall Building
Project Engineer: Tim Brewer
Contractor: Addison Smith Mechanical Contractor, Inc.
Estimated Project Cost: $380,000
Construction Dates: In progress
The project includes installation of a new HVAC system in Faculty Hall Building originally built in 1970. The new HVAC system is integrated with the existing Siemens Digital Direct Control Management System. It provides automated temperature control system and assists to be energy efficient. Project's scope of work includes installation of new air duct work and components, hot/chilled water piping. Building has also received a front window upgrade with an energy efficient double pane glass.